Project Updates


Coco Beach Lot 30 - Construction Update (January 2022)

Coco Beach Lot 13 - Construction Update (January 2022)
Excited to start this new home. The reinforcement of the foundations and floors of Panama for Life homes are far beyond the minimal legal requirements in Panama. We build solid houses to enjoy for generations to come!

Coco Beach Lot 30 - Construction Update
Kitchen almost installed, bathrooms being finished, terrace being tiled....really the last touches. Ready for someone to move in and start a great new life on Coco Beach

Coco Beach Lot 71 - Construction Start (Oct 30, 2021)
The construction works have started for the property on lot 71. Stay tuned for upcoming updates regarding this property!

Coco Beach Lot 15 - Construction Update (Oct 30, 2021)
Windows: Check. Doors: Check! The property is now fully closed, which means the works on the interior continue. Air conditioners are being installed, the kitchen is being placed, etc..
The home features 2 bedrooms with direct access to the terrace on the backside of the property, a 3rd bedroom that functions as an office an open kitchen with a living room that flows into the terrace.

Coco Beach Lot 47 - Construction Update (Oct 30, 2021)
Roof works continue on the property on lot 47. In the coming weeks, the property will be fully closed, while the works on the interior can continue.

Coco Beach Lot 39 - Construction Update (Oct 29, 2021)
The property is almost ready for its door and windows! While the interior works continue, some final touches are being done to the exterior of the house. Besides, the pool has arrived on site!

Coco Beach Lot 15 - Construction Update (Oct 17, 2021)
The finishing works of the property on lot 15 continue. In the coming weeks, the windows and doors will be installed, after which the kitchen and final works can be done! Getting ready (be)for(e) Christmas! :)
The home features 2 bedrooms with direct access to the terrace on the backside of the property, a 3rd bedroom that functions as an office an open kitchen with a living room that flows into the terrace.

Coco Beach Lot 22 - Construction Update (Oct 16, 2021)
Structural works; done! Interior tiling; done! This beautiful property with a just as beautiful lot and natural surroundings is close to getting finished. Walking through the property and looking out through the windows and over the terrace gives you the amazing tropical feel you are looking for.